To summarise- Phase 2 is to include the following:
· The construction of 3 canopied areas in the vicinity of the Mart and Green Room to optimise usage of the outdoor area and protect people from rain showers whilst enjoying refreshments.
· Improvements to safety and disabled accessibility by installing handrails on steps and linking up paving round Green Room to the disabled toilet.
· Levelling the area on the east side of the Green Room to accommodate mobile catering vans.
· Tidying up the west side of the Mart with vehicular access.
· Upgrading the Green Room kitchen to bring it up to standard as a Food Premises which will include a separate handwashing sink, double bowl sink for washing dishes and installing a grease trap.
With the canopies, kitchen upgrade, increased safety measures together with general tidying up, this project is now completed.
Thanks to SSE – Gordonbush Windfarm for helping with funding this work.